Trade Mark Journal No.2026/033 14 August 2026
WO0000001930406 (9,42)
Office of origin: Israel
Date of International Registration:14 June 2026
Date of designation in the UK:
14 June 2026

International priority date claimed: 5 March 2026
(Israel)
(391608)
- Class 9
- Integrated hardware and downloadable software platforms for power quality control and electrical load management within data centers and high-performance computing (hpc) environments; computer software for micro-second power quality management of server racks and high-density computing clusters; computer software for regulating electrical power consumption of processors, graphics processing units (GPUs), and AI accelerators; computer software for monitoring, analyzing, stabilizing, and managing electrical power consumption of computational workloads; computer software for real-time telemetry collection and analysis of electrical grid data for the purpose of optimizing data center operations; computer software for micro-scheduling computational workloads to align with available power capacity; downloadable computer software for aligning processor operation timing with instantaneous electrical grid capacity; electronic control apparatus integrated into computing infrastructure for regulating electrical power consumption of processors, graphics processing units (GPUs), and AI accelerators; computer hardware and integrated hardware-software systems for monitoring, analyzing, stabilizing, and managing electrical power consumption of computational workloads.
- Class 42
- Software as a service (SaaS) for observability, power quality control, electrical load management, and optimization of computing workloads in data centers and AI factories; providing temporary use of non-downloadable software for micro-scheduling computational workloads in millisecond intervals; providing temporary use of non-downloadable software for analyzing electrical grid telemetry data to optimize the performance of computing hardware; design, development, and maintenance of software platforms for managing electrical load profiles of artificial intelligence computing infrastructure; platform as a service (PaaS) featuring software for real-time monitoring and management of electrical power consumption of processors, graphics processing units (GPUs), and artificial intelligence accelerators; technical consulting services in the field of power efficiency and load optimization for high-performance computing (HPC) facilities; research and development services in the field of electrical power optimization for data center infrastructure.
NIV-AI LTD
Representative: Gornitzky & Co., 20 Hacharash St., 6350671 Tel Aviv, ISRAEL